GIDC Gujarat Apply Water Connection
Please follow the below Steps to Apply for Water Connection,
Related : GIDC Online Application for Land Gujarat : www.statusin.in/36674.html
Application Form
To download and view Water Supply Regulation Act 1991 -First Amendment 2010. The Corporation provides facility of water supply in certain estates only. Please confirm with respective GIDC field office for availability of infrastructure.
Documents Checklist
The following documents should be kept ready and submitted along with the duly filled up application form of Water Connection.
** Editable application form (Adhesive stamp of Rs. 100)
** Copy of Offer cum Allotment letter
** If Chemical Unit – Copy of GPCB NOC
** Copy of Approved Building Plan (Not Mandatory)
** Copy of Licence Agreement
** Possession Receipt and / OR Final Transfer Order (Mandatory)
** Final Plot Utilisation Extension Order if Moratorium period is over on day of application.
Note : If necessary, GIDC will ask the applicant to submit other necessary documents to process the application.
Scrutiny Procedure
The following verification is carried out by GIDC before providing approval and connection to applicant
** If building plan is approved. OPTIONAL
** Permanent W/S connection.
** Whether quantity applied for same in License Agreement and Application.
** If difference, then what is the reason (A query may be raised to the applicant in such case).
** Scrutiny of NOC from GPCB and GPCB Application.
** Connection from roads other than front facing road.
** Verify that water supply connection can be given from the existing supply line from the facing road at distance.
** Whether sufficient water harvesting arrangement made by applicant.
** Visits the site and fix the location of water metre chamber, verify the free fall arrangements in water reservoirs or at places of use, proper drainage arrangement.
** Provides schematic diagram of connection from water supply mains to connection chamber, and calculation of water connection charges, deposits, contribution charges to applicant.
Note : Ideal time for processing a Water Connection application without any queries post physical submission of application form and required documents at respective DEE office is as below.
No. | Process | Ideal time |
1 | Providing approval for connection | 10 days from date of application |
2 | Providing physical connection on site | Max 50 days from date of approval application (Provided all the formalities are completed by the Allottee) |
Frequently Asked Questions
What is GIDC?
Gujarat Industrial Development Corporation (GIDC) is the Nodal agency of the Government of Gujarat for providing Industrial backbone of the state. GIDC has been set up under the Gujarat Industrial Development Act 1962 as a Statutory Board.
GIDC has been established with a vision of “To make GIDC an effective, vibrant and timely provider of quality industrial infrastructure with easy, quick and transparent delivery mechanism at competitive pricing and without losing sight of its social responsibilities.”
What are the benefits of being in GIDC estate?
** GIDC land is classified as non-agricultural, thus eliminating the need for NA/NOC permission and need for verification of titles
** Titles of GIDC land / building are free from encumbrances and are marketable
** GIDC provides world class infrastructure as well as state of art facilities in its estates.
** GIDC estates provide quality water supply and adequate power supply.
** GIDC estates are equipped with Chemical and Waste Disposal Systems
** Regular Maintenance of Infrastructure
** GIDC estates facilitate cluster benefits related to raw material, market, technology, common services, linkages etc.
** GIDC offers reasonable allotment price with flexible payment options
** The chemical estates are equipped with environment management infrastructure
** GIDC also provides sites / land for solid waste disposal and for CETPs at concessional rate