KESCO Application for Requisition of Supply of Energy : Uttar Pradesh

Organisation : Kanpur Electricity Supply Company Ltd
Facility : Application for Requisition of Supply of Energy

Home Page : https://kesco.co.in/wss/
Download here :https://www.statusin.in/uploads/5982-requisition%20of%20supply%20of%20energy.pdf

Requisition of Supply of Energy :

Processing of Application for Supply :
** Application for new connections, in prescribed form (Annex 4.1 in supply code) and complete in all respects and accompanied by the prescribed Registration-cum-processing fee, shall be filed in duplicate in the office, specified by the KESCo, along with self-attested true copies of the following documents

Related : KESCO Bill Payment through Mobile Phone Uttar Pradesh : www.statusin.in/2297.html

(i) Proof of ownership of the premises in the form of registered sale deed or partition deed or succession or heir ship certificate or deed of last will or Proof of occupancy such as valid power of attorney or latest rent paid receipt or valid lease deed or indemnity form as per Annex 4.2. Order Copy of appropriate court, in case of litigation regarding ownership of the premises, has to be enclosed.
(ii) Approval / permission /NOC of the local authority, if required under any law /statute.
(iii) In case of a partnership firm, partnership deed.
(iv) In case of a Limited Company, Memorandum, articles of Association, Certificate of incorporation and list of Director- s/certified addresses..
(v) Work completion and Test certificate, on the prescribed format (Annex-4.4), given by the licensed electrical contractor.
(vi) Owner- s consent for getting new supply (Annex 4.3)
** KESCo officials shall arrange to assist the applicants, if required, in completing the application form.
** The KESCo concerned official shall verify the application and the enclosed documents at the time of receipt of application. Written acknowledgement shall be issued on the spot. The acknowledgement shall indicate the date of proposed inspection (not later than 10 days in electrified areas, and two weeks in un-electrified areas) if the application is complete, otherwise it should mention the shortcomings if the application is incomplete.
** No application for the new connection for an electrified area shall be refused under any circumstances if it complies with statutory requirements and is in conformity with Act. In case consumer has not been intimated within stipulated period about any deficiencies in his application, the application shall be deemed to have been accepted for processing by the KESCo.
** KESCo shall not be responsible if the reasons for delay are on account of Right of Way, acquisition of land, technical feasibility and lack of transmission capacity etc, over which the KESCo has no reasonable control, provided the reasons for the expected delay are communicated to the applicant within the period specified for energisation.
** If any information furnished in application form is found wrong or the installation is defective or the energisation would be in violation of provision of Act/Electricity Rules/tariff Order, the KESCo shall not sanction the load and shall intimate the applicant the shortcomings/reasons thereof in writing on the spot as far as possible.

Related Post

Where to submit the application form :
The filled application form along with the requisite documents are to be submitted to the Sub-Divn. Officer (Op.) of the area Concerned.

Enclosures :
** Work Completion Certificate and Test Report (B & L form)
** Documentary evidence in support of lawful occupation of the premises. If the applicant is not the owner of the premises, indemnity bond as specified by the Licensee shall be enclosed.
** Factory / Industry / Premises / Establishment / House map, where supply is desired, indicating tentative position of the meter box.
** Receipt for payment, if cash / cheque / draft.
** In case of industry resolution of the Board of directors for authorising a person to sign the document on behalf of the company.

Note 1 :
In case of consumers without MDI meter, the connected load can be 200% of the contracted load in the domestic category and 133 % of the contracted load in the commercial category

Note 2 :
In your own interest, please ensure permanent disconnection of your electric supply, and obtain “No Dues Certificate” from Division before vacating the premises

Note 3. :
Electric Connection shall not be treated as a proof of ownership of the Premises