X

KESCO Apply for Temporary Electricity Connection : Uttar Pradesh

Organisation : Kanpur Electricity Supply Company Ltd Uttar Pradesh
Facility : Apply for Temporary Electricity Connection

Home Page : https://kesco.co.in/wss/
Download here : https://www.statusin.in/uploads/6000-requisition%20of%20temporary%20supply%20of%20energy.pdf

Procedure for Temporary Supply

** KESCo may grant temporary supply for a period not exceeding 2 years for building construction and three months for other purposes of temporary nature, unless otherwise provided in the tariff order.

Related : Uttar Pradesh KESCO Transfer of Electricity Connection & Mutation of Names : www.statusin.in/5985.html

Related Post

** The filled application form along with the requisite documents are to be submitted to the Sub-Divn. Officer of the area Concerned.
** Application for temporary supply shall be given in the format prescribed in Annex 4.5 to the local office of the KESCo at least 15 days before the day when supply is required where no new pole or mains extension is required and 30 days where additional pole(s) or mains extension Is required along with the following documents


(i) No objection certificate, to ensure safety and security, from the local authority/owner of the premises if the supply is required at a place owned by the local authority /owner of the premises.
(ii) Proof of ownership in case applicant is not a consumer of the KESCo for the premises where temporary connection is to be given or copy of the latest paid bill of the KESCo in other cases.

** The KESCo shall examine the technical feasibility and if feasible shall send to the applicant an estimate of the cost of the service line and other charges within a week of the receipt of application.
** The KESCo shall also intimate the charges towards electricity consumption for the period for which supply is requested, as per tariff approved by the Commission from time to time.
** After deposit of the estimated cost and the advance charge for electricity as intimated above, the load shall be released within 3 days for load up to 50 KW and within 21 days for loads exceeding 50 KW. However, the load shall be released only after receipt of approval in writing from the electrical inspector in cases where 100 or more people are expected to gather at a place.
** The date of availing of the temporary supply may be got amended, to a date not later than 90 days of the date in the original sanction, by the consumer/ applicant, by applying to the authority who sanctioned the load, at least three days before the commencement date indicated in the order.
** In case any permit / licence / NOC is withdrawn by the competent authority after the connection is energized, the supply shall be disconnected forthwith and shall be reconnected only after the permit / licence / NOC is restored. Further, KESCo shall not be liable for any damages. Reduction of any charges or refund shall not be permissible on this account.
** For further extension of the period of temporary supply, the consumer/applicant shall apply to the KESCo at least one week before the date of expiry of temporary supply. The KESCo may grant extension subject to the provisions of clause 4.10(a) and deposit by the consumer/applicant of the advance charges of electricity, for the period of extension.
(i) On conversion to permanent services, the security amount deposited by consumer if any shall be adjusted in security deposit required for permanent connection.

Categories: Uttar Pradesh
Tags: kesco.co.in

View Comments (2)

    • (i) No objection certificate, to ensure safety and security, from the local authority/owner of the premises if the supply is required at a place owned by the local authority /owner of the premises.

      (ii) Proof of ownership in case applicant is not a consumer of the KESCo for the premises where temporary connection is to be given or copy of the latest paid bill of the KESCo in other cases.

www.statusin.in © 2022 Contact Us   Privacy Policy   Site Map