rajwater.gov.in New Water Connection Procedure : Rajasthan Public Health Engineering Department

Organization : Public Health Engineering Department
Service Name : Procedure For New Water Connection
State : Rajasthan

Website : http://www.rajwater.gov.in/wc_rules.htm

New Water Connection :

Step 1 :

Related : Rajasthan Public Health Engineering Department Pay Water Bill Online : www.statusin.in/25491.html

Any persons which also includes a corporate body being owner of the premises may apply for new water connection at his premises by obtaining the prescribed application form from the concerned Assistant Engineer office. Alternatively the applicant may present his application form through a registered plumber of the department.

Step 2 :
In case the applicant is not the owner of premises in which he requires a water connection and is a tenant in the said building or land, he should get the application endorsed by the owner of the premises giving ‘No Objection’ certificate for the water connection in the name of tenant. The tenant than shall be required to furnish a deposit of Rs. 1000/- as security deposit which will be refunded to him when he leaves the premises without any arrears pertaining to water supply against him.

Step 3 :
With the application form, the applicant shall furnish the true copy duly attested by notary public as a proof of ownership of premises or land such as Registry/ Patta/ Agreement/ Ration card/ Electric Bill and Oath certificate as prescribed by the department on a Rs. 10/- non judicial stamp paper duly attested by notary public.

Step 4 :
After submitting of form with the Assistant Engineer office, the Junior Engineer of department will check the site for feasibility of giving water connection. If water connection is feasible, the applicant will be informed by letter with demand note.

The connection fee along with security deposit (Security deposit- Rs. 200/- + connection fee Rs. 100/- in case of owner and Security deposit- Rs. 1000/- + connection fee Rs. 100/- in case of tenant) be deposited within 15 days from the date of issue of such demand note. If there is any road cut involves for making the connection, the required estimate for the same be given to applicant, which is deposited by applicant to the concerned Municipal Authority as the case be.

Related Post

Step 5 :
The applicant shall make his own arrangement for pipe fitting at his own cost by a registered plumber of department, The applicant have to produce the certificate for pipe fitting along with the security deposit and connection fee and the receipt of amount deposit with concerned Municipal Authority, if road cut involves as per the estimate given by the department.

Step 6 :
After fulfilling and depositing all fee the water connection of the applicant be sanctioned and water meter be installed at the said premises and the applicant is allowed to use the water.

Step 7 :
If the premises, where water connection is required, is on society land, then levy amount is also deposited as given in demand note.8.

Step 8 :
(a) Cost of application form ( Rs. 1.00)
(b) Security Deposit for water connection (Rs. 200.00 (if Owner)/ Rs. 1000.00 (If tenant))
(c) Water Connection Fees Rs. 100.00
(d) Declarations by consumer in prescribed format on Rs. 10.00 Non Judicial Stamp paper
(e) For the building more than 2 story One time levy @ 15.00 Per Sqm will be charged

Step 9 :
New Water connection in Slums/Kachhi Basti be sanctioned on the basis of house survey No./ Ration Card / Electric Bill .

Contact Us :
Head Office PHED :-
PHED Jal Bhawan 2,
Civil Lines,
Jaipur 302006

PBX No. : 2222337, 2221837, 2222522, 2225461, 2222263, 22222657