You are here: Home > Delhi
All posts from

Tata Power DDL : Apply For New Connection & Check Application Status Online

Organisation : Tata Power Delhi Distribution Ltd
Facility : Apply for New Connections with Load of 11KW & above
Apply Here : https://www.tatapower-ddl.com/applynewconnection/terms
Download here :https://www.statusin.in/uploads/6042-20150312133149294.pdf

Sponsored Links:
Want to ask a question / comment on this post?
Go to bottom of this page.

How To Apply For Tata Power New Connection?

** To apply for a Tata Power new connection, please fill in the basic details in the form to generate a New Connection Request notification number. Please Click here to access the Form
** After you fill the form and submit it, you will receive a call from our Sampark Kendra within 48 Hrs.

Related / Similar Service : Download Duplicate Electricity Bill TPDDL

** The Sampark Kendra will provide you the details of the documents to be submitted and information regarding nearest location for submission of documents. These details can also be accessed by clicking on the links below

Sponsored Links:

Document List Centers For Tata Power Connection

List of Document Submission Centers for Tata Power Connection
** Customers have to mandatorily visit any of the Document Submission Centers along with the necessary documents to initiate the new connection process.
** New Connection Request Notification will be cancelled if the Documents are not submitted within 3 working days

Important information while applying for new connection :
Ensure complete wiring with proper load distribution on all phases and a safe place for meter installation with minimum height of 2 ft. from the ground.

For load requirement 5 KW and above, proper earthing to be available :
** For 1 phase – MCB/ELCB (>= 5KW)
** For 3 phase – 4 Pole (MCCB & ELCB) or RCCB

FAQ On Tata Power Connection

Frequently Asked Questions (FAQ) On Tata Power Connection

How to register for a New Connection?
To register a new connection request, customers may use following options :
** Type TPDDL NEW and send to 56070 or
** Call our 24 Hrs. Sampark Kendra 011-66404040
** Visit nearest District Customer Care Centre
** Online through Customer Services section on our website tatapower-ddl.com

How to calculate the load to be applied :
Sanctioned load means the load in Kilo Watt, which is agreed to be supplied to the customer. The Sanctioned Load may be calculated by the simultaneous use of load (machines, appliances, fans, lights etc.) at any duration. For example : During Summer, AC Load shall be included for Sanctioned Load and Geyser shall not be, as both are normally not used together.

An application for new connection may be rejected due to reasons including but not limited to following :
** Documents not complete
** Wrong / forged information regarding address, supply type etc.
** Demand Note not paid
** Dues on premises not paid
** Wiring incomplete
** ELCB not installed (in case of load more than 5 KW)
** Separate dwelling unit not found (in case of separate connection for floor system)
** Electrification pending due to non-payment from land owning agencies.

About Us

Tata Power Delhi Distribution Limited [Tata Power-DDL] is a joint venture between Tata Power and the Government of NCT of Delhi with the majority stake being held by Tata Power Company (51%).

Tata Power-DDL distributes electricity in North & North West parts of Delhi and serves a populace of 7 million. The company started operations on July 1, 2002 post the unbundling of the erstwhile Delhi Vidyut Board (DVB).

Some Important Information From Comments

Error / Problem:
1. I have applied for new connection at Model Town Office for Janta Vihar, Mukund Pur, Delhi and my request number is 2011002084. I called to customer care to know my status, he told me that, there is more than load than its capacity of the transformer and my request has been cancelled. He is not able to tell me, when the new heavy loaded transformer will be installed. There is lots of Abadi (People) at Janta Vihar, who had applied for new connection and constructing their plots, suffering from this problem. This is my humble request you to please tell me, when it will be installed? So that, we may not suffer this problem for long time.

2. I was applied and completed all required activities but, my meter is not installed till today, it is too late. It proves that, NDPL is going like DESU. I was applied on September 21st but, may be false objection applied and it’s too late when department will aware.

Benefits of Tata Power New Connection

Tata Power is one of the largest integrated power utilities in India that provides new electricity connections to households, businesses, and industries. The benefits of getting a new connection from Tata Power are:

Reliable Power Supply:
Tata Power is known for its reliable and uninterrupted power supply, which is essential for households, businesses, and industries.

Easy Application Process:
The process of applying for a new connection from Tata Power is simple and hassle-free. Customers can apply online, and the company has made the process convenient by providing a step-by-step guide on their website.

Quick Processing:
Tata Power ensures quick processing of new connection applications, which means that customers can get their power supply up and running within a short time.

38 Comments
Add a Comment
  1. my Request no- 2035766488

    Please issue my demand note for new meter

  2. I applied for new electric connection on dated 02nd March 2022 vide request no.00202921XXXX but verification has not been done as yet although I was informed for visit on 12th March.

    Pl do needful.

  3. I was applied and completed all required activities but my meter not installed till today it is too late it proves that NDPL is going like DESU I was applied on September 21.but so maybe false objection applied and it’s too late when department will aware

  4. Our request no is 2023723307. Please issue me demand note. My request is pending for two months.

  5. My request number is 2018169079. May I know my request status?

  6. My request number is 2013314314. Please provide me status for my new meter application.

  7. My request number is 002014149709. Where to deposit?

  8. My request no. is 002014108736. Please issue my demand note for new connection.

  9. Req no : 2013623392

  10. Request no : 2013502241
    Please issue demand note.

  11. My request no is 2013284994.

  12. MY REQ NO IS 002010530144 ON 12TH NOV.2015. WHERE IS MY DEMAND NOTE?

  13. REQ. NO. 2012722568
    Status?

  14. I have applied a new connection & submitted all relevant documents. Now I want visiting hours by the NDPL officials after 2 pm.

  15. Ranveer Singh Negi

    My request no is 2011578781 for new connection in Burari Delhi.

  16. My request no is 002010986780.
    Please issue my demand note for new meter.

  17. Bal Kishan Sharma

    Req no : 2011499548

  18. My request no is 2011535095 issued on 16 may 16. Please issue my demand note For new meter.

  19. New connection REQUEST NO is 2011522595.

  20. My request no is 002011522495.

    1. MY REQUEST no 2011522495 is pending since 17.5.2016. BUT NO reply has been RECEIVED so far. You are requested to look into the matter and demand note may PLEASE be issued at the earliest.

  21. REQUEST NO.IS 2011234892 SITE VERIFICATION IS COMPLETE & ALL DOCUMENTS ARE SUBMITTED POWER OF ATTORNEY COPY & VOTER ID.
    SO PLEASE ISSUE ME DEMAND NOTE NO EARLY.

  22. SUKHESH KUMAR CHOUDHARY

    MY REQUEST NO IS 002011237254, PLEASE ISSUE DEMAND NOTE.

  23. I want my connection because this is disconnected without any information. My ca no is 60010953960.

  24. Gayatri Devi Somani

    My request no is 2011212073. Please issue my demand note for new meter.

  25. Armaan Ali Idrisi

    I have applied for new connection at Model Town Distt. Office for Janta Vihar, Mukund Pur, Delhi and my request No. is 2011002084. I called to customer care to know my status, he told me that there is more than load than its capacity of the transformer and my request has been cancelled. He is not able to tell me when the new heavy loaded transformer will be installed. There is lots of Abadi (People) at Janta Vihar who had applied for new connection and constructing their plots, suffering from this problem. This is my humble request you to please tell me, when it will be installed? So that we may not suffer this problem for long time.

    Thanks

  26. My request no is 002010798016. Please issue demand note.

  27. Please issue demand note for request no 2009643406 been verified by your company employee. It got delay because of load problem.

    1. Please issue demand note for request no 2027553838 been verified by your company employee. It got delay because of load problem. Please my contact number

  28. How I can get a copy of duplicate bill against CA No. 60016570990

    1. You can pay your bill using your CA no and email id. After entering into your account is there any option to download duplicate copy.

  29. My requect No. 2010358307
    Please send my demand note

  30. My req.no.2010217737
    Please send my demand note.

  31. My req no 002010416119
    Please issue my demand note for new meter

  32. Our Request no is 2010259547 please issue our demand letter note for Temporary meter.And tell me whats the further process,I have submitted all the required document on 15 th September.

  33. MY REQ.NO.2010057420 PLEASE ISSUE MY DEMAND NOTE FOR NEW METER

    1. I have applied a new connection my request no.2027553838..in burari Pradhan enclave c block gali no.1.
      called to customer care to know my status, he told me that there is more than load than its capacity of the transformer and my request has been cancelled. He is not able to tell me when the new heavy loaded transformer will be installed. There is lots of Abadi (People) at Janta Vihar who had applied for new connection and constructing their plots, suffering from this problem. This is my humble request you to please tell me, when it will be installed? So that we may not suffer this problem for long time.

      Thanks

  34. My request no is 2009766906

Leave a Reply

How to add comment : 1) Type your comment below. 2) Type your name. 3) Post comment.

www.statusin.in © 2021 Contact Us   Privacy Policy   Site Map
Status Check, Procedures, Facilities